How-to
How to Install a Dry Well in 7 Steps
Quick Summary
To install a dry well, first test the soil by timing how fast a filled test hole drains, then size the pit to the roof and surface runoff it must handle. Lay it out at the required setbacks, excavate, line it with fabric, fill it with washed gravel, connect the drainage pipe, and run a flow test before backfilling.
- Dig a 2-foot test hole and time the drop; about 1 inch per hour or faster signals workable drainage.
- Call 811 before digging so buried utility lines are marked.
- Size the well by roof footprint times a pitch factor of 1.1 to 1.3, then add a storage margin.
- Line the pit with landscape fabric to keep fine soil from clogging the gravel.
- Pour water into the inlet after connecting the pipe to confirm it drains before backfilling.
Table of Contents
- Dreams Set in Stone: How to Install a Dry Well in 7 Steps
- Step 1: Assess the Site and Check Local Requirements
- Step 2: Size the Dry Well for Roof and Surface Runoff
- Step 3: Lay Out the Dry Well and Mark the Excavation
- Step 4: Excavate the Pit to the Correct Depth
- Step 5: Prepare a Level Base and Line the Pit with Fabric
- Step 6: Fill with Dry Well Gravel and Set the Drainage Components
- Step 7: Connect the Drainage System, Backfill, and Test Flow
- Booking Your Dry Well Installation with Santini's Landscape
- Frequently Asked Questions
Dreams Set in Stone: How to Install a Dry Well in 7 Steps
Last Updated: November 21, 2026

Step 1: Assess the Site and Check Local Requirements
Every dry well starts with a simple question: will the ground actually drain? At Santini's Landscape, we check the site before we dig anything, because knowing how to install a dry well properly starts with the soil. A dry well that sits in soil that won't absorb water becomes a wet hole with a lid. Dreams Set in Stone means getting this first step right, because everything after it depends on the ground beneath.
Before any excavation, we walk the property and note where roof downspouts discharge, where water pools after a storm, and how far the house foundation and property lines sit from the proposed location. Those observations shape everything that follows.
Testing Soil Drainage and Water Table Depth
A percolation test is the practical way to judge whether the soil will accept water. Dig a test hole about 2 feet deep and roughly 12 inches across, fill it with water, and let it drain overnight so the soil reaches a saturated state. The next day, refill the hole and time how long the water level drops. A test drop of about 1 inch per hour or faster generally signals workable drainage; slower than that, a dry well may not be the right approach for the site, and your local building or stormwater office can advise on alternatives.
Check the water table as well. A high groundwater level leaves no room for a dry well to do its job, and it can push water back into the pit. If the test hole holds water for a day or more, or if you hit saturated soil near the bottom, the site is likely unsuitable for a standard dry well.
Setbacks, Utilities, and Permit Checks
Call 811 before any digging. This free service marks buried gas, electric, water, and communication lines before excavation begins. Wait for the marks to be confirmed and photographed before the machine arrives.
Next, confirm setbacks with your local building or zoning office. Many municipalities set minimum distances from foundations, property lines, septic systems, and wells. A common pattern is a minimum distance from the foundation and from property lines, plus a larger separation from wells and septic drain fields, but the exact numbers vary by town and county. Ask whether a permit is required, since rules vary widely, and ask whether the dry well must be shown on a site plan.
Watch out: a dry well placed too close to a foundation can concentrate water against the basement wall, and one placed over a septic drain field can overload it, confirm every setback in writing before you stake the footprint.
Step 2: Size the Dry Well for Roof and Surface Runoff
Sizing comes down to how much water needs a place to go, and it is the step that decides how you install a dry well that actually performs. Roof area is usually the largest source. Add up the square footage of the roof sections that drain to the dry well, plus any nearby paved or sloped surfaces. A simple method is to measure the footprint of each roof section and multiply by a pitch factor, roughly 1.1 for a low slope, 1.2 for a moderate pitch, and 1.3 for a steep roof, to approximate the actual surface area.
Next, convert that area to runoff volume. Multiply by the rainfall depth for the design storm your local stormwater authority or extension office recommends, often a 1-inch or 2-inch event for residential drainage, to estimate the volume the well must handle.
Then match that volume to the storage capacity of the dry well. A stone-filled pit stores water in the voids between gravel, while a modular chamber stores water in its open interior. A perforated barrel stores water in the barrel itself. Compare the design volume to the storage capacity and add a margin, because undersized systems overflow quickly and it is usually better to build a little larger than you think you need.
Watch out: sizing only for the roof and ignoring a sloped driveway or patio that also drains toward the well is a common cause of overflow, include every surface that sheds water to the pit.
The table below summarises the sizing inputs and rules of thumb covered in this step.
| Input | Value | Note |
|---|---|---|
| Roof pitch factor, low slope | 1.1 | Multiply roof footprint |
| Roof pitch factor, moderate pitch | 1.2 | Multiply roof footprint |
| Roof pitch factor, steep roof | 1.3 | Multiply roof footprint |
| Design storm depth | 1 to 2 inches | Set by local stormwater authority or extension office |
| Percolation test drop | About 1 inch per hour or faster | Signals workable drainage |
| Storage margin | Build larger than calculated | Undersized systems overflow quickly |
Roof pitch factors for dry well sizing
Step 3: Lay Out the Dry Well and Mark the Excavation
Place the dry well at least the required distance from the house and property lines, then mark its footprint with stakes and marking paint. Confirm the outlet and inlet routes so the pipe runs downhill toward the well.
Walk the layout before digging. Check that the spot is clear of utility marks and tree roots, and that the excavation will not undermine a structure.
Step 4: Excavate the Pit to the Correct Depth
Dig the pit to the depth set by your design, plus room for a gravel base. Keep the walls as straight as possible and remove loose soil from the bottom so the base stays firm.
Excavation is physically demanding work. Many homeowners prefer to have a crew handle it, and Santini's Landscape can dig the pit for you. Learn more about our excavation service for this step.
Step 5: Prepare a Level Base and Line the Pit with Fabric
Level the bottom of the pit and tamp it firmly. An uneven base lets the structure settle and tilt over time.

Line the walls and base with landscape fabric. The fabric keeps fine soil from washing into the gravel and clogging the system. Overlap the seams generously so no soil gets through.
Step 6: Fill with Dry Well Gravel and Set the Drainage Components
Add washed stone in layers, tamping as you go. Clean, angular gravel allows water to move through quickly. Set the perforated pipe or modular chamber at the planned height, with the inlet connected to the downspout line. For durable options in heavy soil, see drainage installation in clay soil that lasts.
Keep the outlet clear and check that the components sit level before adding more stone.
Step 7: Connect the Drainage System, Backfill, and Test Flow
Connect all pipe joints and confirm each one is secure. Pour a bucket of water into the inlet and watch it drain. Water should move through the stone and disappear within a reasonable time. If it backs up, check the connections and the gravel depth.
Once the flow test passes, fold the fabric over the stone, backfill with soil, and top it with sod or mulch. For a sense of the full timeline, read how long a drainage installation really takes. Grade the surface so water flows away from the house.
Booking Your Dry Well Installation with Santini's Landscape
A dry well is a job where the details decide whether it works for decades. Santini's Landscape focuses on completing one project before moving to the next, so each job gets full attention from start to finish. Contact us to request a quote or schedule your dry well installation.
Ready to stop standing water before the next storm? Request a free quote from Santini's Landscape today. You Need Santini's.
Frequently Asked Questions
How deep should a dry well be?
Most residential dry wells are dug deep enough to reach a permeable soil layer that drains well, often several feet below grade, but the exact depth depends on the site. Soil drainage testing and the depth to the water table determine how far down the pit should go. Keep the bottom of the dry well well above the seasonal high water table so runoff can soak into the ground rather than sit. Santini's Landscape can test your site and recommend a depth that fits your yard and drainage goals.
Should a dry well be filled with gravel?
Yes. Dry well gravel, typically clean washed stone, fills the pit around the chamber or perforated pipe and provides storage space for water while it infiltrates into the surrounding soil. Clean stone keeps fine soil from clogging the pit. Landscape fabric placed between the soil and the stone helps keep the system working over time. Dreams Set in Stone begins with a properly filled base that drains as designed.
How do you connect a downspout to a dry well?
Route the downspout to the dry well inlet using rigid pipe with a slight downward slope so water flows by gravity. Seal the connection and confirm the pipe is secured so it does not shift during heavy rain. Some installers add a cleanout or a catch basin to trap debris before it enters the pit. Check the connection after the first heavy rainfall to confirm water is draining instead of pooling at the downspout.
When should a dry well installation be handled by a professional?
Consider professional installation when the site has poor soil drainage, a high water table, slopes that direct runoff toward structures, or utility lines near the planned excavation. Permit requirements, setbacks from foundations, and sizing calculations for roof and surface runoff also benefit from professional review. A contractor can test the soil, confirm the layout, and handle heavy excavation safely. You Need Santini's when you want the drainage done right the first time.